MMG will provide all necessary training and online user documentation for the following Plans, Procedures & Instructions.

Depending on the size of the Project, and if Greenfield or Brownfield and involvement by MMG, this includes:

  • over view of the
    • Material Management Plan (MMP)
    • Instruction Packing, Marking & Shipping (IPMS)
    • Traffic Management Plan (TMP)
  • site material control & warehousing
  • TracBASE instructions, and
  • requirements as provided by the Client.

A training schedule (who & what) is available, and can be incorporated with the Clients training requirements.

  • Material Management Plan (MMP)
  • Instruction Packing, Marking & Shipping (IPMS)
  • Traffic Management Plan (TMP)
  • Oversupply, Short or Damage (OS&D)
  • TracBASE application
  • Overview – Material Tracking Process
  • Material Process Workflows (Supplier, Transit Offsite Locations & Site)
  • Unloading Check Materials (Goods Receipt)
  • Barcode
  • Field Material Request (Goods Issue)
  • Preparation – Material Delivery Pack (MDP)
  • Preparation – Material Issue Pack (MIP)
  • Location Change
  • Goods Dispatch
  • Stock take & Schedule
  • Loading Unloading Trucks
  • Manual Handling on Site
  • Storage Specification for Materials at Construction Sites
  • Oversize Overmass Load Delivery plan (OSOM) etc